第7回
浜岡5号機 駿河湾の地震に伴うタービン保全復旧報告
著者:
長谷川 義朗,Yoshirou HASEGAWA,堀井 一明,Kazuaki HORII,青木 薫,Kaoru AOKI,柴下 直昭,Naoaki SHIBASHITA
発刊日:
公開日:
キーワードタグ:
Hamaoka Nuclear Power Station Reactor No. 5 was automatically shut down when an earthquake occurred in Suruga Bay on August 11, 2009. A special maintenance plan for inspections to verify the soundness of equipment and facilities in Hamaoka Nucle ar Power Station was formulated following the earthquake. The main steam turbine in Hamaoka Nuclear Power Station Reactor No. 5 was inspected based on the plan. The middle standard bearing box, which had the thrust bearing of the turbine was fou nd to lift slightly...
英字タイトル:
Maintenance Report of Hamaoka Nuclear Power Station Reactor No. 5 Turbine Damaged by Suruga Bay Earthquake